Audited Deliverable Samples

Sample Concrete Takeoffs — CSI Div 03 Excel & Bluebeam

Review actual deliverables provided to United States contractors. Every sample features formula-driven CSI Division 03 itemized spreadsheets and marked-up vector drawing sets.

Real Proven Experience • Verified US Projects

Inspect Our Real Concrete Takeoff Deliverables

Don’t settle for generic promises. Review actual CSI Division 03 estimate spreadsheets and color-coded Bluebeam plan markups prepared for US general contractors.

Higher Education & Institutional

Murray State University (KY)

Verified Concrete Scope: $2,423,303 (Concrete Sub-Total: $1,795,039)

Comprehensive structural and site concrete takeoff for multi-story university facilities. Measured Continuous Concrete Footings (WF2.12, WF7.12B, WF6.12), detailed horizontal/transverse rebar (#5 and #6 bar @ 18" O.C), formwork square footage, trench excavation, backfill compaction, and specialized gypcrete.

Continuous Footings
96.1 CY with 10% waste
Rebar Reinforcement
7,364+ LBS (#5 & #6 Bar)
Formwork Required
2,689+ SF Contact Area
Building Code Specs
CSI 03 00 00 & 01 00 00
Deliverables Provided to Client:
CSI Division 03 Itemized ExcelBluebeam Marked-up Drawings S101A/S401Summary & Schedule Breakdown

Download Complete Sample Takeoff Set

Receive the actual sanitized Excel estimate spreadsheet with live formulas + marked Bluebeam PDF drawing set.

✓ Formatted CSI Division 03 Tabs
• Footings, Grade Beams, Slab on Grade
• Rebar #3 to #10 LF & Weight (LBS)
• Formwork Contact SF & 10% Waste Factor
• Material, Labor & Equipment Breakdown
Request Sample Excel & Bluebeam Markups
No credit card needed • Direct download link sent immediately
Let's Win Your Next Bid

Submit Your Drawings For a Fixed-Price Quote

Send your current drawing set and bid deadline. We review the available documents and confirm the included scope, project fee and delivery date before work starts.

Call Senior Estimator
+1 (317) 751-5969
Email Plans Directly
info@fkconcreteestimating.com
Estimating Operating Hours
Monday – Saturday: 7:00 AM – 9:00 PM EST
Our Estimating Guarantee
  • Document handling and any NDA agreed before sharing
  • Revisions on All Addenda before Bid Day
  • Direct Phone Consultation with your dedicated estimator

By submitting, you ask FK Concrete Estimating to contact you about this enquiry. Upload only drawings you are authorized to share; anyone with their unique file link can access them.

WhatsApp